Follow Me

TERMITE CONTROL

TERMITE CONTROL
  •  AFTER EXCAVATION COMPACTION SHOULD BE DONE ON THE EARTH SURFACE AND TERMITE CONTROL SHOULD BE DONE
  • GENERALY EARTH WORK IS TREATED TO CONTROL FROM INSECTS TO STRACTURE OF SUBSTRACTURE
  • IT SHOULD DONE ON FOUR SIDES OF FOOTING AND BOTTOM SURFACE OF ECAVATION 


Share this:

2 comments :

 
Copyright © CONSTRUCTION9 ESTIMATION. Designed by OddThemes | Distributed By Gooyaabi Templates