P.C.C BED IN CONSTRUCTION

06:29

P.C.C BED( PLAIN CEMENT CONCRETE )


A BED BELOW WALL FOOTINGS, COLUMN FOOTINGS,PLINTH BEAM,WALLS BELOW BEAMS

A SIL CONCRETE USED TO GET HEARD AND FLAT SURFACE AT WINDOWS AND VENTILATOR SILS

PRECAST CONCRETE

    Usually concrete structures are built by casting them in their final position in the site by providing form work, pouring concrete and then removing the form work. It is called as cast-in-situ construction. If concrete elements are cast in factories or elsewhere and transported to their final destination, they are called precast elements.
Since the elements are cast in factories where controls are better, they are superior to cast in situ elements. However, the disadvantage is cost of transportation and achieving desired connections on site. Precast concrete is used in the following:
1. Pipes and tanks
2. Poles, piles, sleepers and pavement
3. Lintel beams
4. Beams and girders
5. Building blocks
6. Wall panels
7. Manhole covers

PLASTERING C:M

18:52

PLASTERING C:M


GRADES OF LASTERING  :

 1:2

1:4

1:6

1:8

  •  1:6 IS GENERALLY USED FOR PLASTERING WORKS

    PLASTERING FOR  INTERAL WALLS 20MM

    PLASTERING FOR EXTERNAL WALLS 25MM

     


STEEL

18:36

STEEL

(THERMO MECHANICAL TREATMENT) 

  • FE-500 TMT BARS

  • FE-500 D GRADE TMT BARS

  • FE 550 TMT BARS

  • TMT BINDING WIRES

  • HIGH TEMSILE STRENGTH , WEALDING FEATURES , BONDING STRENGTH WITH CONCRETE

                                              WEIGTH OF EACH STEEL ROAD = D2/162x40
WHERE D=DIA OF BAR
  • ONE STEEL ROD (U-SHAPED) =12Mor 40'

    Buy Aone Fe-500 TMT Steel Online 

    BRANDS

    JINDAL PANTHER TMT

    KAMADHENU TMT STEEL

    TATA TISCON TMT

    VIZAG TMT

CORSE AGGREGATE

18:23

CORSE AGGREGATE

  •  IT IS FILLERS IN CONCRETE

  • SIZES 6MM,12MM,20MM,40MM

  • OTHER NAMES BLUE METAL

  • LARGER THEN 4.75MM 

  • IT ACTS AS LOAD BEARING INGREDIANT TO CONCRETE

  •  IT SHOULD BE DUST FREE THAT COULD EFFECT HYDREATION AND BOND OF PASTE 

     12 mm. GGCP Coarse Aggregates

SAND

18:14

SAND


RIVER SAND :


RIVER IS A FORM OF FINE AGGRIGATE ETRACTED FROM RIVER .
USED FOR MANY CONUSTRUCTIONS.

Trichy River Sand-18 Tons

 SLAG SAND :

IT IS A FINE AGGRIGATE USED ALONG WITH CHEMICAL ADMIXTURES
MINEING SAND FROM RIVER BEDS IS NOT LEGAL

 Slag Sand-28 Tons


M SAND : 

IT IS NEW INNOVATION FOR CONSTRUCTIONS
USED AS REPLACEMENT OF RIVER SAND
IT HAS MUCH DEMAND AS RIVER SAND IS BECOMING SCARE
IT IS PRODUCED IN A FACTORY BY CRUSHING GRANITE ROCKS

SBSC Concrete M-Sand
M-SAND


TERMITE CONTROL

23:09
TERMITE CONTROL
  •  AFTER EXCAVATION COMPACTION SHOULD BE DONE ON THE EARTH SURFACE AND TERMITE CONTROL SHOULD BE DONE
  • GENERALY EARTH WORK IS TREATED TO CONTROL FROM INSECTS TO STRACTURE OF SUBSTRACTURE
  • IT SHOULD DONE ON FOUR SIDES OF FOOTING AND BOTTOM SURFACE OF ECAVATION 


EXCAVATION

23:00
EXCAVATION

  • FOR RAFT FOOTING EXCAVATION SHOULD BE DONE FOR WHOLE SITE FOR REQUIRED DEPTH
  • IF FOOTINGS ARE VERY NEAR THEN ECAVATION SHOULD BE DONE FOR WHOLE SITEAND THE BACK FILL SHOULD BE DONE

  • FOR SIMPLE FOOTINGS EXCAVATION SHOULD DONE 1' MONE THEN GIVEN FOOTING DIMENSION FOR REMOVAL OF SHUTTERING AND WORKER PASSING

SITE MARKING

22:54
SITE MARKING

  •  IT IS A PROGRAM OF SITE EXECUTION FOR FOOTING AND COLUMN PLACEMENT 
  • IT SHOULD BE CLEAR TO UNDERSTAND BY SITE ENGINEER AND MESTRI(SITE WORKER )
  • MARKING SHOULD BE DONE CLEAR WITH LIME POWDER OR SPRAY MACHINES




SURVEYING

22:47
SURVEYING :EAMIN AND RECORDS OF AREA AND FEATURES OF SOIL AS TO PLAN AN ARCHITECTURAL AND STRACTURAL PLAN.

THERE ARE MANY SURVEYS
  • LAND SURVEY  
  • AREA MEASURMENT
  • NATURE OF SOIL

  • TOPOGRAPHICAL SURVEY
  • MARKET SURVEY

BORE OR SUMP

22:40
BORE OR SUMP

  • FIRSTLY INFORMATION SHOULD BE COLLECTED FROM NEAR BY SITE 
  •  IF THERE BORE WELL DIGGING SHOULD BE DONE
  • BORE WELL HOLE SHOULD BE CLODES FOR SAFETY PERPOSE 
  • IF NOT SUMP SHOULD BE CONSTRECTED AT SITE
BORE WELL MACHINE DRILLING
bore well






BORE MOTOR

LEVELING

22:13
LEVELING

  • IT SHOULED BE DONE WHEN SITE IS IN UP'S ND DOWN 
  •  
  • LOOSE SOIL SHOULD BE DONE HARDEN BY RAMPING








SHED

21:56

Temporary Shed

  • It should be constracted on site

  • A person should be appointed 

  • Construction material should bring for site before construction sheduled date(before 2-3 days for cement ) 

  • Can use dust power(rock crush powder) insted of soil because it is temporary 

Temporary Shed at construction
temperory shed

STEP BY STEP ACTIVITES IN SUB STRACTURE

19:57




Step by Step procedure to start an project in an correct pattern for good life of building. Earth work should be done clean when up's and down there ,surveying should be done accoring to given land document for leagel procedure and further isues, Site marking should be done by eperts because total structure depends on the site marking , excavation should be done for given S.B.C (soil baring capacity ) then termite control should be done.procedure should be done step by step



 earth work 
LEVEL-FOR-BUILDING-SITE
LEVELING

Surveying
SURVEYING-FOR-BUILDING-CONSTRUCTION
SURVEYING

Site marking (perfect center lining and angles at intersection )
SITE MARKING-FOR-BUILDING-CONSTRUCTION
SITE MARKING

Excavation (Minimum excavation for g+2 buildings with good S.B.S is max 7')
excavation for buildings
ECAVATION

Termite control(anti fungus spray)

TERMITE CONTROL
TERMITE CONTROL

P.c.c bed for footing protection 


Footing shuttering (centering works)
FOOTING SHUTTERING
SHUTTERING

Tie beam (to make stracture as framed stracture)
TIE BEAM IN BUILDING CONSTRUCTION
TIE BEAM

Neck column arrangement
NECK COLUMN ARRANGEMENT
NECK COLUMN


Bitumen paint (increases the life of stracture and gives strength)
BUTIMEN PAINT OIN CONSTRUCTION
butimen paint




 