Follow Me

BORE OR SUMP

BORE OR SUMP

  • FIRSTLY INFORMATION SHOULD BE COLLECTED FROM NEAR BY SITE 
  •  IF THERE BORE WELL DIGGING SHOULD BE DONE
  • BORE WELL HOLE SHOULD BE CLODES FOR SAFETY PERPOSE 
  • IF NOT SUMP SHOULD BE CONSTRECTED AT SITE
BORE WELL MACHINE DRILLING
bore well






BORE MOTOR

Share this:

Post a Comment

 
Copyright © CONSTRUCTION9 ESTIMATION. Designed by OddThemes | Distributed By Gooyaabi Templates