STEP BY STEP ACTIVITES IN SUB STRACTURE





Step by Step procedure to start an project in an correct pattern for good life of building. Earth work should be done clean when up's and down there ,surveying should be done accoring to given land document for leagel procedure and further isues, Site marking should be done by eperts because total structure depends on the site marking , excavation should be done for given S.B.C (soil baring capacity ) then termite control should be done.procedure should be done step by step



 earth work 
LEVEL-FOR-BUILDING-SITE
LEVELING

Surveying
SURVEYING-FOR-BUILDING-CONSTRUCTION
SURVEYING

Site marking (perfect center lining and angles at intersection )
SITE MARKING-FOR-BUILDING-CONSTRUCTION
SITE MARKING

Excavation (Minimum excavation for g+2 buildings with good S.B.S is max 7')
excavation for buildings
ECAVATION

Termite control(anti fungus spray)

TERMITE CONTROL
TERMITE CONTROL

P.c.c bed for footing protection 


Footing shuttering (centering works)
FOOTING SHUTTERING
SHUTTERING

Tie beam (to make stracture as framed stracture)
TIE BEAM IN BUILDING CONSTRUCTION
TIE BEAM

Neck column arrangement
NECK COLUMN ARRANGEMENT
NECK COLUMN


Bitumen paint (increases the life of stracture and gives strength)
BUTIMEN PAINT OIN CONSTRUCTION
butimen paint